Culminating a long professional relationship with General Dynamics Electric Boat, Tecton was selected to design a vital new facility – Building 604 – to serve as Electric Boat’s Nuclear Support Facility. The new 4-story building supports both radiological and non-radiological events within the shipyard, and serves personnel from federal and local entities. Special consideration was given to the design of power, data, A/V, acoustics and environmental controls, to ensure that the building is fully operational in the event of an emergency.
Connecticut
34 Sequassen Street, Suite 200
Hartford, CT 06106
Thank you for joining our email list!
Oops, there was an error sending your message.
Please try again later.
Tecton Architects, pc