A white background with a few lines on it
June 16, 2023
Tecton Selected to Design Cheshire’s Two New Elementary Schools
RECENT POSTS
By Jennifer Saari December 30, 2024
With heartfelt admiration and gratitude, we announce the retirement of Robert A. Amatuli, AIA, Principal, effective December 31, 2024. After a distinguished 45-year career in architecture, Robert will step away from his role, leaving behind a lasting legacy of dedication to design excellence, leadership in healthcare architecture, and a commitment to mentorship.
Pin-Up Collage
May 31, 2022
Prioritizing creativity and collaboration in a hybrid world.
Tecton Architects Office
March 9, 2022
Tecton announces the promotions of four staff members: Justin Hopkins, Matt Salad, Rebecca Hopkins and Jennifer Saari
Firehouse Magazine Award
February 6, 2022
Tecton Architects, in conjunction with H2M Architects + Engineers, was awarded the top prize in Firehouse Magazine's 2021 Station Design Awards, the Career 1 Gold award. The team was also recognized by the Fire Industry Education Resource Organization (F.I.E.R.O.) as a Merit Award Winner.

After a months-long search, the Cheshire Next Generation School Building Committee has selected Tecton Architects to design two new elementary school projects as part of the Town’s long-term school modernization plan.

The selection follows a lengthy review of qualifications, fee proposals, tours of completed school projects and an in-person interview.

 

The new Norton Elementary School will be built on the site of the existing Norton Elementary School, with a new school also planned for an open parcel at Marion Road and Jarvis Street. The total project cost for both projects is anticipated to be approximately $166 million. Both projects are scheduled for simultaneous design and construction, with planned occupancy for the 2026 school year.

SHARE

Share by: